C Fly (gas scooter ,EEC, EPA, DOT)

FOB Price: Get Latest Price
Model:ZN125QT-20
Certification:DOT,EPA,EEC
Minimum Order:50 PCS
Brief Description:Powerful scooter - C -FLY1.Patent gas scooter 2.EEC EPA DOT 3.ZNEN-2013 4.New Model

Milton Yang

  • Product Details

Basic Specification

Max. Speed95km/h
Engine TypeGasoline
Load Capacity150kgs
Displacement125

Detail Description

Specifications
C Fly
1.gas scooter
2.EEC, EPA, DOT
3.we can do 125C power, also do we can do 50CC and 150CC models.

 C Fly (gas scooter ,EEC, EPA, DOT) 
 
 
Specification
Drive systemBelt drive
Front and rear shockFront hydraulic rear spring shock
Electric and speedmeterEight level direct current , speedmeter(speed,mileage,fuel tank capacity)
Lighting systemFront headlamp,front and rear winker,rear tail light
Exhaust systemMute exhaust
Switch control systemFunction left and right swtich
Cylinder diameter39 mm
Piston stroke41.5
Battery type12V7A
Max power and rotate speed2.0KW(2.72HP)/7000rpm
Max torque and rotate speed3.01/5000(N.m/rpm)
Minimum ground clearance(mm)130
Compression ratio10.2:1
Unladen mass(kg)87
Load capacity(kg)150
Economic oil consumption2.0
Climbing capacityAngle: 30 degrees
Minimum turning radius1750MM
Speed changeV type belt stepless speed change
 
 
1,Selling points:
1,It can match multicolor and stickers
2,we can do 125C power, also do we can do 50CC and 150CC models.
3,Front and rear vacuum tire :durable,fasten, balanced ,and beautiful. the tire is wear-resisting and aiti-explosion.
4,Disc brake has high safety performance and has no noise
5,The motorcycle can install rear box and rear carrier
 
2,Color schemes of the new product
 
Black
 

 
Yellow
 

 
Silvery white
 

 
 Blue
 

 
 
3,Multi-angle product

 
 

 
4,Product details picture
 

 
Wear-resisting and explosion-proof tires
 

 
5,Package information 
 
 
Package information
Gross weight(KG)105
Net weight(KG)87
Packing mode/quantity:CBU full carton package 50pcs (40*HQ)
CBU iron package 50pcs (40*HQ)
SKD iron package 75pcs (40*HQ)
Package size(mm)CBU full carton package 1900*580*1200
CBU iron package 1900*580*1200
SKD iron package 1900*580*860
 

6,Our workshop
 
7,Our plant and Product certificate

 

Additional Information

Payment TermsL/C, T/T
Minimum Order50 PCS
Lead Time / Delivery Time20 Day(s)
Sample AvailableYES Ask For Sample
Delivery Details20 days after deposit or L/C
FOB PortNingbo
Loading Infoby vessel
Packing InfoCBU full carton package 50pcs (40*HQ)CBU iron package 50pcs (40*HQ)SKD iron package 75pcs (40*HQ)
Target Market(s)Africa(except Middle East), Eastern Europe, Latin America, North America, Central & Southern Asia, Southeast Asia, Western & Southern Europe

Send your message to this manufacturer


3000
SearchPost Buying Lead