Big sport scooter with power scooter parts

FOB Price: Get Latest Price
Model:ZN150T-B
Certification:EEC,EPA,DOT
Minimum Order:50 PCS
Brief Description:Big sport scooter with power scooter parts1.water-cooled2.PATENT,EEC,EPA,CARB3.Unique motorcycle

Milton Yang

  • Product Details

Basic Specification

Max. Speed95km/h
Engine TypeGasoline
Load Capacity150kgs
Displacement150

Detail Description

Specifications
Big sport scooter with power scooter parts
1.water-cooled
2.PATENT,EEC,EPA,CARB
3.Unique motorcycle

Big sport scooter with power scooter parts  
 
Specification
Drive systemBelt drive
Front and rear shockFront hydraulic rear spring shock
Electric and speedmeter Twelve level direct current , speedmeter(speed,mileage,fuel tank capacity)
Lighting systemFront headlamp,front and rear winker,rear tail light
Exhaust system Mute exhaust
Switch control systemMute exhaust
Cylinder diameter39mm
Piston stroke41.5
Battery type12V7A
Max power and rotate speed(kw/(r/min))7.2/8000
Max torque and rotate speed(N.m/(r/min))8.4/6000
Minimum ground clearance(mm)140
Compression ratio10:1
Unladen mass(kg)135
Load capacity(kg)150
Economic oil consumption2.9
Climbing capacityAngle: 30 degrees
Minimum turning radius1780MM
Speed changeV type belt stepless speed change
 
 
 
 
1,Selling points:
 
1,It can match multicolor and stickers
 
2,we can do 125C power, also do we can do 50CC and 150CC models.
 
3,Front and rear vacuum tire :durable,fasten, balanced ,and beautiful. the tire is wear-resisting and aiti-explosion.
 
4,Disc brake has high safety performance and has no noise
 
5,The motorcycle can install rear box and rear carrier
 
 
 
2,Multi-angle product

 
 

 
 
 
3, Wear-resisting and explosion-proof tires
 
4,Package information
 
Package information
Gross weight(KG) 
Net weight(KG) 
Packing mode/quantityCBU iron package disassemble the front wheel 36pcs (40*GP)
CBU iron package 32pcs (40*HQ)
BU full carton package 32pcs (40*HQ)
Package size(mm)CBU iron package disassemble the front wheel 1990*750*1120
CBU iron package 2200*750*1220
BU full carton package 2120*750*1200
 

5,Our workshop
 
6,Our plant and Product certificate

 

 

Additional Information

Payment TermsL/C, T/T
Minimum Order50 PCS
Lead Time / Delivery Time20 Day(s)
Sample AvailableYES Ask For Sample
Delivery Details20 days after deposit or L/C
FOB PortNingbo
Loading Infoby vessel
Packing InfoCBU iron package disassemble the front wheel 36pcs (40*GP)CBU iron package 32pcs (40*HQ)BU full carton package 32pcs (40*HQ)
Target Market(s)Africa(except Middle East), Eastern Europe, Latin America, North America, Central & Southern Asia, Southeast Asia, Western & Southern Europe

Send your message to this manufacturer


3000
SearchPost Buying Lead